Typefast — Productized Rails Engineering

(01) — Rails Performance Optimization

Find the real
bottleneck.

Slow queries, N+1s, bloated memory. We profile your application, find the bottlenecks that actually matter, and ship measurable improvements with before/after benchmarks.

Price
$5,000 – $20,000
Timeline
1 – 10 weeks
Assessment
$1,500, credited toward the project
Output
Before/after benchmarks

(02) — Tiers

One bottleneck, or all of them?

01

Targeted Optimization

Qualifies when

  • /Specific bottleneck identified
  • /Slow endpoint or heavy query
  • /Background job queue issues

You receive

  • Bottleneck isolation
  • Query and index optimization
  • Cache strategy improvement
  • Before/after benchmarks
  • 7-day post-deploy support
$5,000
1–2 weeks
02

Full Stack Optimization

Most Common

Qualifies when

  • /Systemic performance issues
  • /Multiple slow endpoints
  • /No clear single bottleneck
  • /Infrastructure costs rising

You receive

  • Full performance assessment
  • Database tuning
  • Query refactors
  • Caching layer implementation
  • Background job throughput improvements
  • Deployment tuning
  • Benchmark report
  • 14-day post-deploy support
$12,000
3–5 weeks
03

High-Traffic Stabilization

Qualifies when

  • /High concurrency application
  • /Scaling issues under load
  • /Revenue-sensitive platform
  • /Memory or CPU instability

You receive

  • Load simulation analysis
  • Advanced query restructuring
  • Infrastructure scaling review
  • Memory profiling
  • Background processing redesign
  • Ongoing monitoring configuration
  • 30-day post-deploy support
$20,000
6–10 weeks

/ $1,500 assessment sets the tier, credited toward the project.

/ Already had a Rails Technical Audit? The $1,500 assessment is waived.

(03) — Payment

You never pay for an attempt.

01 Begin

50% to begin

Paid once the tier is set and scope is agreed.

02 Milestone

25% at the milestone

Paid at the agreed mid-optimization milestone.

03 Validation

25% on production deploy

Paid once the work is delivered in production — not before.

/ If the optimization cannot be completed because of technical infeasibility discovered during the assessment, only the assessment fee applies. You are never billed for work that turns out to be impossible.

(04) — Start Here

Ready to make it fast?

Tell us about your application and we'll tell you which tier fits.